Heroizutechng Blog

Land Survey, Setting-Out Engineering, GIS Processing, Structural/Civil Works and General Contracts Call +2347064649087 www.heroizutechng.blogspot.com.ng

Showing posts with label Setting out central line of tunnel. Show all posts
Showing posts with label Setting out central line of tunnel. Show all posts
Friday, 9 August 2019

How to draw road profiles with Autocad Civil 3D and how to set up

›
https://youtu.be/vhlh0fBI2Uk
Sunday, 11 November 2018

QUESTION : EXPLAIN BASIC RULES IN PRACTICE WHEN CONDUCTING A LEVELING

›
1.      EXPLAIN BASIC RULES IN PRACTICE WHEN CONDUCTING A LEVELING                       Levelling is the process of measuring the dif...
Tuesday, 19 December 2017

Describe the different surveys to be carried out for the highway projects.

›
Describe the different surveys to be carried out for the highway projects. i) Reconnaissance ii) Preliminary Survey iii) Location Sur...

Explain the methods of transferring reduced levels from surface to underground in a tunnel setting out work.

›
Explain the methods of transferring reduced levels from surface to underground in a tunnel setting out work.  i) Setting out central line...
›
Home
View web version

About Me

My photo
THE PROFESSORS KNOWLEDGE
View my complete profile
Powered by Blogger.