Heroizutechng Blog

Land Survey, Setting-Out Engineering, GIS Processing, Structural/Civil Works and General Contracts Call +2347064649087 www.heroizutechng.blogspot.com.ng

Tuesday, 9 August 2016

LESSON NOTE ON CHECK ON CLOSED TRAVERSE

›
CHECK ON CLOSED TRAVERSE 1. Check on angular measurements (a) The sum of the measured interior angles should be equal to (2N – 4) x 90 ...

LESSON NOTE ON CHECK ON OPEN TRAVERSE

›
CHECK ON OPEN TRAVERSE In open traverse, the measurements cannot be checked directly. But some field measurements can be taken to check t...

LESSON NOTE ON MEHODS OF TRAVERSING

›
MEHODS OF TRAVERSING Traverse survey may be conducted by the following methods : 1.      Chain traversing (by chain angle) 2.      Co...

LESSON NOTE ON CROSS-STAFF AND OPTICAL SQUARE

›
CROSS-STAFF AND OPTICAL SQUARE A. Cross-staff The cross-staff is a simple instrument for setting out right angles. There are three type...

LESSON NOTE ON PROCEDURE OF PLOTTING

›
PROCEDURE OF PLOTTING 1. A suitable scale is chosen so that the area can be accommodated in the space available on the map. 2. A margin...

Lesson Note On The importance of geodetic control in the construction process

›
The importance of geodetic control in the construction process  The purpose of construction guidance observations Geodetic observations ar...

LESSON NOTE ON SPHERICAL TRIANGLE

›
SPHERICAL TRIANGLE The theodolite measures horizontal angles in the horizontal plane, but when the area becomes large, such as in the cas...
‹
›
Home
View web version

About Me

My photo
THE PROFESSORS KNOWLEDGE
View my complete profile
Powered by Blogger.