Wednesday 14 December 2016

LESSON NOTE ON USING PLANE TABLE AND ALIDADE SURVEY

METHODS OF SURVEY:
USING PLANE TABLE AND ALIDADE SURVEY
 Image result for USING PLANE TABLE AND ALIDADE SURVEYImage result for USING PLANE TABLE AND ALIDADE SURVEY
1. This is a method of survey that allows a surveyor to plot and create an accurate scale drawing on site. The idea is to scale down the site to a size that fits onto the drawing board.

2. A plane table is a drawing board which is fixed to a tripod, leveled, and orientated. An alidade is a sighting device used to observe the salient points of the site.

3. Have a good look at the site before you start the survey, time should be taken to walk round and have a good look at the site or building that you are going to record. On a building, the obvious features that you would want to record are the corners, door and window openings, fireplaces. More subtle features that you would look out for are changes in wall direction, straight joints, blocked doors or windows, crack slots, changes in the stonework, changes in floor covering, byre drains.
 Image result for USING PLANE TABLE AND ALIDADE SURVEY
STEP 1:-SELECT A SURVEY STATION

Once you have had a good look at the site, you will select a position for your survey station from which you have a line of site to as many of the main points as possible. It is particularly important to be able to see all the corners and places where a feature has a change in direction. Set up the tripod legs over your selected survey station. Prepare the drawing board; a piece of polyester drafting film is taped onto the drawing board with masking tape. The corners are taped first, with the film pulled tight, and then the edges are taped. The board is fixed onto the tripod.
 Image result for USING PLANE TABLE AND ALIDADE SURVEYImage result for USING PLANE TABLE AND ALIDADE SURVEY
STEP 2:- ORIENT THE DRAWING BOARD

When drawing a building you would orientate the long side of the board so that it is parallel to the long axis of the building. If possible, for a site plan, you would orient the board so that north is up the page. For all plans it is important to check that the whole site is going to fit on the board at your chosen scale. A pin is positioned into the board to give a fixed point from which observations and measurements can be taken. The pin marks the position of your survey station on the board. Once the survey has commenced the plane table should not be moved.
 Image result for USING PLANE TABLE AND ALIDADE SURVEYImage result for USING PLANE TABLE AND ALIDADE SURVEY
STEP 3:- CARRY OUT THE SURVEY

The alidade is placed against the pin and used to observe in turn, selected points. Rays are drawn on the film and measurements between the pin and the points taken with the 30mtape. The measurement is written onto the drawn ray as a record. Subsequently, each point is plotted along the ray at the selected scale, ' with a scale rule. Observations and measurements are taken to as many points as required to allow the shape to be recorded. These plotted points create an accurate framework around which the rest of the plan can be constructed. This method is most useful for plans of single buildings or small siteswithin a radius of 30m from the plane table.

THE 3 MAIN TYPE OF LEVELS / LEVELLING INSTRUMENT

LEVELLING INSTRUMENT
Image result for 3 MAIN TYPE OF LEVELLINGImage result for 3 MAIN TYPE OF LEVELLING
Level is an instrument used in establishing horizontal line. it uses spirit babble tube with the construction of telescope, you can sight or object aid also focus, line of sight is called line of collaboration. Basically there are 3 main types of level or leveling instrument.
Each instrument have a few basic parts the working of which will be firmly under store. Hide are dumping level, tilting level, automatic level. Each is used in sighting different ways.
 Image result for 3 MAIN TYPE OF LEVELLING
DUMPING LEVEL
This is the most common form of survey level and it consist of able tube attach to the telescope.
The telescope is rightly fixed to the stage which has 3 or 4 foot screw.
The foot screw used to bring the babble to the centre of its run and also to make axis of the babble horizontal. If the line at collimation is parallel to the able axis then the line of collonation is horizontal. The advantage was in the fact that when it is leveled, you can sight all the direct – this instrument is getting out of the ………………….
Image result for 3 MAIN TYPE OF LEVELLING
TILTING LEVEL
Is an improvement of the dumping level, instead of being tilted. When using this instrument it is only necessary to set it roughly leveled. As babble is finally leveled for each reading by means of adjusting screws ad thus greater accuracy is obtained. Since the babbles axis is always mark to be right angle with the axis however the adjustment is done before every reading.
Image result for 3 MAIN TYPE OF LEVELLING
AUTOMATIC LEVEL
Just as the name implies, it is an automatic instrument. the instrument may be out of adjustment if the recticle is mis-position after carrying out the task as described for titling level.
In automatic level, the horizontal hair is brought to the correct readings by MV of recticle.

The instrument has circular spirit babble you don’t have to set the babbles every time. It also gives direct image instead of inverted images.

Along with any of the above 3 types of level we can also use level staff, staff plate or cross-foot especially when we are on soft ground.